Load & hang
Arrange prepared parts on hangers or a rack, allowing for their dimensions and the agreed working load.
POWDER COATING OVENS AUSTRALIA
Custom oven and material movement systems for workshops with larger components or higher production requirements.

PRODUCTION OPTIONS
Start with how your parts move through the workshop. A top-hung arrangement, a large batch chamber or a complete equipment setup can be discussed around your available space and production plans.
Suspend parts from an overhead rail arrangement. Plan rail height, hanging clearance, working load and transfer method around your components and required batch volume.
EXPLORE ↗CUSTOM CHAMBERSSize the chamber around larger fabrications or batch loads. Explore heating, doors, sectional supply, site access and the space needed to load and unload.
EXPLORE ↗WORKSHOP EQUIPMENTDiscuss oven, racks or rails, powder gun and extraction together. Bring your workshop layout and workload so the equipment requirements can be considered as a complete setup.
EXPLORE ↗FROM LOADING TO UNLOADING
The oven is one part of the process. The way parts are loaded, sprayed, moved, cured and unloaded matters when planning the complete system.
Arrange prepared parts on hangers or a rack, allowing for their dimensions and the agreed working load.
Move parts to the preparation and coating stages in your workshop’s process. Booth and extraction arrangements are planned around the site.
Move the coated batch into the oven and run the specified curing cycle. Loading and movement depend on the agreed rail or trolley design.
Move cured parts to an appropriate cooling area, then unload and prepare the hangers or rack for the next batch.
Illustrative process only. This is not a site layout or a representation of automatic conveyor operation. Part preparation, movement method and curing requirements are agreed for the application.
For a top-hung arrangement, parts are suspended from the rail system. For a floor based batch arrangement, parts are loaded on racks and transferred by trolley. The layout and transfer method are chosen around the application.
Tell us what needs to stay on the hanger or rack throughout the process, and where parts need to be loaded or unloaded. This helps us discuss the oven opening, rack layout and supporting equipment.
EXPLORE TOP-HUNG SYSTEMS ↗
YOUR PRODUCTION BRIEF
These inputs establish the starting point for a written equipment specification. Rail capacity, transfer arrangements and production output need to be assessed for your actual parts and process.
Electric or gas heating and digital control box or PLC touchscreen options are discussed as part of the oven specification. Chamber size, operating temperature and available site services guide the configuration.
Include trolley or hanging arrangements, powder gun requirements and booth extraction in your enquiry. Individual items and supply inclusions are confirmed in the quote.
Systems are supplied to the agreed equipment specification. Site preparation, electrical works, gas fitting, installation, certification, engineering approvals and local compliance are the purchaser’s responsibility unless specifically agreed otherwise. Use appropriately licensed contractors for site work.
YOUR NEXT STEP
Tell us what you coat, your required internal oven size and your location. We’ll help put together a suitable system.
REQUEST A QUOTE ↗